Magellan ProMark3 RTK Specifications Page 123

  • Download
  • Add to my manuals
  • Print
  • Page
    / 292
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 122
109
Note that the content of the Site ID field is incremented by
1 after ending static occupation on a point (increment: 0
to 9, then A to Z, then 0.. again, etc.). You can however
change the Site ID between any two occupation times by
pressing the LOG key (not the on-screen LOG button) and
editing the Site ID field.
12.Move to the next point and resume the above two steps
until all the points have been visited.
13.Ta p Done after surveying the last point. This completes the
data collection phase.
Running a Kinematic Survey
Base Setup and Operation
The base is setup and operated in the same way as it is in
static surveys (see page 88). The only difference is the possi-
ble use of the initializer bar at the base station.
The base antenna should be centered and levelled above the
known point. To be able to use the initializer bar for initializa
-
tion, be sure to incorporate the bar as part of the base setup
as shown opposite. This bar gives an accurate baseline of 0.2
m (0.656 ft) for initialization.
Cross points indicate
where static occupations
take place.
The line indicates
continuous data
collection, from the first to
the last point.
0001
0002
0003
0004
00050006
0007
Rover
Allowing for kinematic
initialization using
Initializer bar at the base
Page view 122
1 2 ... 118 119 120 121 122 123 124 125 126 127 128 ... 291 292

Comments to this Manuals

No comments